Current Location:Homepage >> SERVICE >> SERVICE-ARTICLES >> Content

Technique Training Service from PSCCL

Author:PSCCL  Time:2013-5-27 14:28:49

PSCCL provides technology training service and basic theory and technologies on sand control of oil and gas well and oil production engineering. PSCCL is sincerely willing to communicate with colleagues from the department of production and development of oilfields through training services. Proper training classes would be executed according to the requirements of customers as well as training time

 

Theory and technology training class for Sand Production and Sand Control technology of oil and gas well

PSCCL provides systematic theory and technology training class for Sand Production and Sand Control technology of oil and gas well with elaborate training materials and multimedia materials. For many years, training service has become one of the features of the Office. The training class covers all the procedures of sanding and sand Control technology, which includes:

◆ The extracting technology of mechanical parameter of rock in reservoir

◆ Reservoir crustal stress prediction method and technology

◆ Systematic sanding prediction method and technique of oil and gas field

◆ Sand control technology and principle

◆ Principle and technology of sand control solution evaluation and optimization

◆ Parameter determination principle and technology of sand control

◆Gravel packing san control of horizontal well and high-inclination well

◆ Production prediction and evaluation method of sanding well

◆ Performance evaluation principle of sand control methods

◆ Application of sand control Office platform


PSCCL  has open over 30 sand control technology training classes for the department of production and development in many oilfields, which includes:

◆ 2006, technology and development training class in Qinghai oilfield

◆ 2006, advanced technology training class in Yumen oilfield

◆ 2006, petroleum engineering training class in Xinjiang oilfield

◆ 2006, technology and development training class in Liaohe oilfield

◆ 2007, advanced technology training class in Xinjiang oilfield

◆ 2007, sand control technology training class in Shengli Production Technology Institute

◆ 2007, sand control technology training class in Kazakhstan.

◆ 2008, sand control technology training class for Xinjiang, Qinghai oilfield.

◆ 2010, sand control technology training class for  Qinghai,COSL oilfield.

◆ 2011, sand control technology training class for Jidong, Shengli oilfield.

◆ 2012, sand control technology training class for Yumen, Dagang oilfield.

◆ 2013, sand control technology training class for Shengli oilfield.

◆ 2014, sand control technology training class for COSL.

◆ 2015, sand control technology training class for Xinjiang, Yumen, Qinghai oilfield.

We are longing to communicate with you any time. If needed, please feel free to contact us.

For contact details, please click here.







Maintain by:Production and Sand Control Completion Laboratory| Tel.:0532-86981910 | Mail:dongcy@upc.edu.cn

Production and Sand Control Completion Laboratory, China University of Petroleum(East China)·#66, Changjiang Xi Road, Huangdao, Qingdao, Shandong, P.R.China

SHANDONG ICP-05021531-8 SHANDONG-37021002000537