Current Location:Homepage >> SERVICE >> SERVICE-ARTICLES >>Content

Future Continuous Construction of PSCCL Conditions

Author:PSCCL  Time:2022-1-13 22:25:22

PSCCL is equipped with series of experimental apparatus involving sand production simulation, sand control optimization, sand carrying simulation, frac-pack well stimulation, integrity evaluation. the laboratory employs apparatus more than 20 installations with 300 m2.  The laboratory has the full ability to accomplish the experiments on sand control and fluid-solid management. 

PSCCL employs the following experimental apparatus:

 ■ Microscopic visual simulation system for sand production with weak-consolidated core

 ■ Middle scale visual simulation system for sand production with different well type 

 ■ Large scale simulation platform of sand-fluid production profile evolution in heterogeneous reservoir

 ■ Visual simulation apparatus for sand retention and evaluation

 ■ Sand control simulation and evaluation system for high TP and thermal oil production

 ■ Experimental apparatus of solid particle feedback production in sandstone reservoir with fran-pack

 ■ Dynamic testing system of screen corrosion 

 ■ Testing and evaluation system for screen erosion

 ■ Wellbore flowing simulation system for gas-liquid-sand multi-phase flow and sand carrying

 ■ Formation sand analyze and shaker

 ■ Rock properties testing devices

 ■ Imaging system for sand production and retention

 

 

 

The following apparatus are under construction of PSCCL:

 2022, Real 3-axis frac-pack simulation system for media-high permeability reservoir

 2022, Sanding simulation apparatus for alternating production of UGGS, Water injection and thermal production

 2022, Comprehensive evaluation system of gravel/frac packing job string

The continuous construction of laboratory conditions will ensure PSCCL advanced ability for research and application on solid management for oil and gas industries.  

 


 

Welcome to visit PSCCL WeChat platform:

 

Maintain by:Production and Sand Control Completion Laboratory| Tel.:0532-86981910 | Mail:dongcy@upc.edu.cn

Production and Sand Control Completion Laboratory, China University of Petroleum(East China)·#66, Changjiang Xi Road, Huangdao, Qingdao, Shandong, P.R.China

SHANDONG ICP-05021531-8 SHANDONG-37021002000537